Tile calculator
Enter the area and the tile size, and this returns how many tiles to order including waste. The waste factor does most of the work here: the same floor needs 10 percent extra in a straight lay and closer to 20 percent in herringbone.
Nothing you type here is sent anywhere. The arithmetic runs on your device and the page makes no network request — see the privacy note.
The formula
Area divided by the coverage of one tile, multiplied by one plus the waste factor, rounded up. A 10-by-4-foot backsplash is 40 square feet; with 12-by-12-inch tiles covering a square foot each, that is 40 tiles before waste and 44 at ten percent.
Tile is sold by the box, not the piece, so the last step is always rounding up to whole boxes. Boxes typically hold 10 to 15 square feet depending on tile size, and the box count is what actually determines what you carry home.
Grout is not in this count and does not follow the same arithmetic: it depends on joint width and tile thickness rather than on area, which is why the grout calculator is a separate tool.
Why the pattern decides the waste
In a grid layout the piece cut off at the wall usually starts the next row, so waste is mostly breakage and the occasional chipped tile — around ten percent. In herringbone every cut is angled, and an angled offcut almost never fits another position, which is why the same floor area can need twice the overage.
HomeAdvisor's published guidance is 10 to 15 percent, covering installation damage and future repairs. The twenty percent figure for herringbone and chevron above is a working rule extending that logic to patterns that source does not price separately, and it is labeled as such rather than presented as a published number.
| Tile | Coverage each | Tiles per 40 sq ft, before waste |
|---|---|---|
| 3 × 12 in subway | 0.25 sq ft | 160 |
| 4 × 12 in subway | 0.33 sq ft | 121 |
| 12 × 12 in | 1 sq ft | 40 |
| 12 × 24 in | 2 sq ft | 20 |
| 24 × 24 in | 4 sq ft | 10 |
Why labor drives the bill, not the tile
Worth knowing while you choose a pattern, because it changes what the waste factor is costing you. Almost none of the hours go into placing tile — they go into removing what was there, leveling the substrate, waterproofing where water will be, and setting out the layout so the cuts land somewhere defensible.
That is why a harder pattern costs more than the extra tile it wastes: it adds setting-out time on top of material. The full breakdown, with the published rates for labor, material and preparation, is in what tile installation costs.
Where tile fits in the room
Tile is usually a line inside a larger renovation rather than a project on its own. In a bathroom it competes with fixtures and plumbing for the budget — what a bathroom remodel costs lays out that split. If the tile is going on a floor, the flooring calculator compares it against the alternatives, and the remodel cost calculator gives the whole-room figure.
Questions people ask
How many tiles do I need?
How much extra tile should I order for a diagonal layout?
How many boxes of tile should I buy?
Why is tile labor so much more than the tile?
Should I keep leftover tile?
- Order an extra 10% to 15% of tiles for damage during installation and future repairs — HomeAdvisor, Tile Installation Cost, 2026 · checked 2026-08-14
- Tile average $2,111, typical range $949–$3,424; labor $3–$15 per sq ft ($60–$120 per hour) — HomeAdvisor, Tile Installation Cost, 2026 · checked 2026-08-14
- Porcelain $2–$15 per sq ft, glazed ceramic $4–$15; demolition and prep $2–$7 per sq ft; backsplash $480–$1,500 — HomeAdvisor, Tile Installation Cost, 2026 · checked 2026-08-14